    When sending electricity, the high voltage side should be sent first, and then the low voltage side; when stopping electricity, the low voltage side should be stopped first, and then the high voltage side. The operation sequence of low voltage single-phase knife gate and high voltage falling fuse is as follows: first close the side phase which is closer to the middle phase, then close the other side phase, and finally close the middle phase.

 